You don't have javascript enabled. Good luck with that.
Pencarian
Satpel SDA Senen Bangun Turap di Bantaran Kali Ciliwung

SDA Builds Sheet Pile on Ciliwung Riverbank

After it is finished, we will continue to do casting and screwing on the side of the sheet pile

To prevent flood water when rain pours, a 260-meter long sheet pile is being built on the Ciliwung Riverbank, Jalan Kramat Batas, Kenari Urban Village, Central Jakarta.

"It has been ongoing since August," said Senen Sub-district Water Resources (SDA) Executing Unit Head, M Rohman, Monday (8/31).

Collapsed Sheet Pile on Jalan Antariksa Raya Repaired

To conduct it, as many as nine officers plus one dump truck had been alerted to the location. The sheet pile itself would be made to 260 meters long.

"After it is finished, we will continue to do casting and screwing on the side of the sheet pile," he closed.

Linked News
Popular News indeks
  1. Pramono Flags Off 10,000 Runners at Soekarno Run 2026

    access_time15-02-2026 remove_red_eye1047 personFolmer
  2. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye943 personAldi Geri Lumban Tobing
  3. Jakarta Unveils Indonesia’s First SDGs Corner at Maritime Museum

    access_time15-02-2026 remove_red_eye928 personNurito
  4. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye889 personAldi Geri Lumban Tobing
  5. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye697 personAldi Geri Lumban Tobing